Concrete mixer lining with extended service life -
Optimized concrete fix and mobile chute assembly. This is the last part of a concrete plant is to transfer the concrete from the mixer to the truck. In the pictures there is a combination of Hardox® 600 as the whole frame, Duroxite® 201 and Nitronic 30. We increased the life time from 8 months with AR 450 to and estimated of 60 months.
Get Price